Search creators⌘K
  1. Home
  2. Creators
  3. Patrick Curran

Patrick Curran

Patrick Curran writes about bringing industrial water technologies from pilot projects to dependable commercial use, with a focus on readiness, manufacturing, field integration, and long-term operation.

24.6K followersBased on 12 posts · latest Oct 2026
LinkedIn

At a glance

Patrick Curran is most useful for testing industrial water technology commercialization readiness before a first utility-scale deployment.

Best for

A water technology company preparing a first utility-scale deployment.

Not for

A home water-filter brand seeking short-form video and broad lifestyle reach.

Key takeaways

  • Readiness is set by the weakest layer, not the best result.
  • A customer's approval only proves what their tests could see.
  • Pilot with curiosity, not desperation.

Check first: Confirm audience analytics by industry, job function, seniority, company size, and geography.

Main ideas
Readiness is set by the weakest layer, not the best result · A customer's approval only proves what their tests could see · Pilot with curiosity, not desperation
Audience
24,599 LinkedIn followers
Read first
Five Layers of Commercial Readiness
Sources for this section

What they are known for

Patrick Curran writes about the hard steps between a promising industrial water technology and dependable commercial use.

  • These posts argue that readiness is not a single score: a technology must also be manufactured consistently, integrated into a working plant, and proven durable in day-to-day operation.
  • They draw on a remote Oman pilot and a licensed technology that later struggled with manufacturing and field performance to show why deployment conditions matter.
  • Curran explains why buyers may rationally stick with established technologies: operating history, available parts, and known risks count alongside projected performance.
  • The posts offer useful context for people assessing industrial technology pilots, commercialization risks, and the evidence needed to earn customer confidence.

Curran makes commercialization risks concrete with questions buyers and developers can test.

  • The five-layer readiness framework checks technology performance, manufacturing consistency, system design, plant integration, and operational durability.
  • In one example, a technology rated highly in the lab was held back by weaker manufacturing and durability.
  • Pilot guidance adds practical checks: Are operators engaged?
  • Is the site stable?
  • Can the team respond quickly?
  • Is there a real path to procurement?
  • The Oman pilot shows how distance and a lack of parts can obstruct learning, even when everyone is committed.
  • Curran treats incumbent advantage as earned, not mere resistance to change: new technologies must build the field evidence and reliability that established systems already have.
  • One post applies this commercial perspective to acid recovery for battery operations, promoting recovery, rental, and processing options.
  • Five layers of commercial readiness · Why a client-approved technology still wasn’t ready · Choosing the right early adopter · Why incumbents have an advantage · Acid recovery for battery operations
Sources for this section

Ideas and priorities

Curran's writing centers on one conviction: most industrial water technologies fail in commercialization, not in the lab, and the failures are predictable if you ask uncomfortable questions early.

Read more

The same questions recur across posts: what is the weakest layer of readiness, will this pilot site let us learn, does the buyer's approval actually prove anything, and why does the incumbent supplier deserve the customer's trust? Curran draws on their own project history, including a licensing deal that looked like success and was not.

Readiness is set by the weakest layer, not the best result

Curran argues that a technology does not have one Technology Readiness Level but at least five: whether it works, whether you can manufacture it consistently, whether you can build a reliable system around it, whether it integrates into the customer's plant, and whether it survives long-term operation.

Read more

The lowest layer governs.

  • Developers report the highest layer and call it the TRL; Curran sees that as how capital gets wasted.
  • The practical test they offer readers is the gap between the highest and lowest layers.

A capacitive deionization program licensed to a multinational: technology rated 8, manufacturing 6, system design 6, field integration 6, operational durability 5. The weak links were variation when modules were built in someone else's factory with someone else's supply chain, and field-fouling recovery that had worked in-house but did not hold up in the field.

Curran says the framework came after the fact: they describe scoring the technology as they should have when the license was signed, and note they have written about the multiple-TRL idea many times since. The concept is retrospective on this project, not how it was assessed at the time.

Read original · Original 2

A customer's approval only proves what their tests could see

Curran distinguishes acceptance from readiness.

Read more

A sophisticated buyer's inspection and approval show that their tests found no problem, not that the technology is dependable.

  • Approval only proves the gaps were not visible in the tests they knew to run.
  • The deployment risk lies in what the buyer did not think to check.

Seven years of development, a signed license with a multinational, and multiple installations the buyer inspected and approved.

  • A few years later, the buyer dropped the product line.
  • Curran attributes the real cause to an operational durability score of 5 behind an appearance of TRL-8, which led to customer acceptance problems and warranty issues.

Read original · Original 2

Pilot with curiosity, not desperation

Curran's rule is to avoid a first customer who needs the system to work.

Read more

Desperation sounds like commitment but leaves no room for the learning curve: valves fail, modules foul, and controls need tuning.

  • They want operators engaged enough to call when something looks off and treat the system as their own, regardless of executives' approval, and a genuine route to procurement—not a showcase that generates press but never buys.
  • Their test: will the site tolerate trial and error, are operators and engineers engaged, and is there a real path to commercial deployment?
  • If any answer is no, walk away, even for a very large customer.

The first pilot was in the Omani desert: everyone committed, but the site was a 36-hour door-to-door journey away, with no hardware store, spare parts, or quick fixes.

  • Curran's proxy question for any site is how close it is to a kit of JB Weld.
  • The company later kept pilots within a couple of hours of its Southern California office, and they worked—not because the technology improved, but because the team could respond and adjust in real time.

Curran presents the rules as hard-won lessons and says the company changed everything after Oman.

  • They note one exception to the distance rule: the company kept a site outside the travel radius because it had strong partner support.
  • Proximity is a default, not an absolute.

Read original

The site can fail the technology, not the other way round

Unstable conditions destroy a pilot's value.

Read more

If the process swings beyond the operating window, the trial teaches nothing, and the failure gets attributed to the technology. Curran says to test the site's stability before committing: a pilot validates the technology, commercial case, operations, and organization.

Desalination pilots where salinity doubled overnight to a level the system could not treat. Curran's assessment is blunt: the technology did not fail; the site did.

Read original · Original 2

Resistance to a new technology is usually rational, not lazy

Curran frames the incumbent's position as earned, not unfair: years of evidence, trained operators, engineers who know how to design around it, available spares, reference installations, and a familiar picture of what breaks, how often, and at what cost.

Read more

Choosing it is sensible based on the information a customer has; a new technology does not deserve adoption just because it looks better on paper. Being better gets you into the race; proving it gets you across the finish line.

PFAS-bearing material incineration: customers know it is expensive but generally works; supply chains can move and treat the material, while cheaper alternatives still carry performance, supply, and environmental-liability risks. Curran says they once argued against engineering firms they saw as clinging to relics of the past, but now sees a good reason for the resistance.

Curran describes an earlier version of themself as complaining that the market was unimaginative. Now they argue the incumbent's advantage was earned, and overcoming it requires many reliable field systems buyers can visit—not a pilot and a slide deck.

Read original

Supply risk is the strongest commercial argument for recovery

When Curran writes commercially, the lead argument is procurement and cost, not environmental compliance.

Read more

They position recovery as a supply-chain decision—independence from virgin acid when it is riskiest to depend on it—and offer rental and off-site processing to customers who cannot commit capital or host the equipment. This is the group's only direct product pitch rather than a general framework; buyers should ask for evidence behind the performance figures, which are company claims, not independent findings.

Sulfuric acid prices tripled after a Strait of Hormuz closure, with China halting exports and Turkey and Russia following.

  • Regent Water systems for acid recovery, neutralization, and zero liquid discharge target lead-acid, lithium-ion, and zinc battery operations.
  • The company describes them as recovering 85 to 95 percent of spent acid, eliminating disposal hauling, and covering both sulfuric and hydrochloric acid.

Read original

Sources for this section

Start with their work

Five Layers of Commercial Readiness

Wondering what to check beyond whether a technology works in a test?

Read more

Curran lays out five readiness questions, from manufacturing consistency to durability in real operations.

Curran uses an industrial water system to show why a single Technology Readiness Level can hide important gaps.

  • The five layers are technology, manufacturing, system design, field and plant integration, and operational durability.
  • Their examples make the distinctions concrete: a device that works under controlled conditions may still vary too much in production, fail to integrate with plant controls, or struggle with fouling and maintenance over time.
  • Curran argues that the lowest layer governs readiness.

For brands planning a campaign

For a deployment-readiness campaign, use the five layers as a due-diligence checklist. Ask for evidence at each layer, including manufacturing consistency, integration with the host facility, and performance through operating and cleaning cycles—not just under controlled conditions.

Client Approved It. It Still Wasnt Ready

Does customer approval prove a technology is ready to scale?

Read more

Curran says it does not, drawing on a licensing and deployment experience to show where readiness gaps can persist.

Curran contrasts a technology rating of 8 with lower ratings for manufacturing, system design, field integration, and operational durability.

  • They describe modules that could be built but were not identical, and difficulties transferring production and system building to another organization.
  • Their example shows how successful tests and buyer approval can coexist with weaknesses that emerge during replication, integration, or sustained operation.

For brands planning a campaign

When evaluating a utility-scale deployment or license, ask who can build the system to the same specification, who will integrate it, and what evidence supports long-term field performance. Treat gaps between readiness layers as deployment risks, even when a sophisticated customer has approved earlier tests.

Are you ready #19? The Wrong Early Adopter Can Kill Your Technology

What makes a first pilot useful rather than merely prestigious?

Read more

Curran draws on lessons from an Oman deployment to offer practical criteria for choosing a site and partner.

The post turns distance from parts and support into a memorable test: “How close are you to a kit of JB Weld?”

  • Curran describes a remote pilot where travel and logistics made quick iteration difficult.
  • They distinguish an engaged partner willing to learn from an organization that wants a showcase but has no route to procurement.
  • Stable site conditions and operators who participate in troubleshooting matter alongside executive approval.

For brands planning a campaign

For a first utility-scale pilot, assess operator engagement, process stability, access to parts and support, and a credible path to procurement. A high-profile site may be a poor choice if the team cannot respond quickly or operating conditions prevent useful learning.

The Incumbent Technology Has Earned Its Advantage

Why might a buyer stick with an established technology even when a new option looks better on cost or efficiency?

Read more

Curran explains the value of operating history and customer confidence.

Curran describes the incumbent’s advantage in practical terms: operators know how to run it, parts are available, and customers have evidence about failures and repair costs.

  • Using treatment of PFAS-bearing materials as an example, they argue that better projected performance is not enough when buyers also face supply-chain and environmental-liability risks.
  • The post frames resistance to change as a decision based on evidence and risk, rather than simple opposition to innovation.

For brands planning a campaign

A campaign for a new industrial technology should show more than favorable performance comparisons. Build the case around dependable field results, service and parts availability, and evidence that addresses the buyer’s operational and liability concerns.

Acid Recovery and Purification

How does Curran connect an industrial technology to an immediate business problem?

Read more

The post frames acid recovery for battery operations as both a waste-management and supply-chain decision.

The post links changing sulfuric-acid supply and prices to recovery options for battery manufacturers and recyclers.

  • It describes recovery, neutralization, and zero-liquid-discharge systems, and gives alternatives for facilities that are not ready for capital investment or are not suited to on-site recovery.
  • Unlike the readiness posts, this is a direct commercial pitch rather than a general framework.

For brands planning a campaign

For a campaign aimed at battery operations, connect the technology to specific purchasing pressures such as acid supply, disposal, and capital constraints. Tie performance and service claims to evidence appropriate for the intended facility; ask for independent verification of the promotional figures in the post.

Sources for this section

Topics and approach

Posts cited for each topic
Format: worked examples, self-scoring, and concrete proxies5
Five-layer readiness scoring2
Approval is not readiness2
Pilot site and partner selection1
Acid recovery and supply-chain framing1

Five-layer readiness scoring

Curran argues that a technology has not one Technology Readiness Level but at least five, and that the lowest governs how ready it really is: whether the technology works, can be manufactured consistently, supports a reliable system, can be integrated into a customer's plant, and survives long-term operation.

Read more

They apply the framework to a capacitive deionization program licensed to a multinational.

  • The team rated it an 8; Curran's report card scores technology 8, manufacturing 6, system design 6, field integration 6, and operational durability 5.
  • Variability in someone else's factory and weak field fouling recovery were the weak links.
  • The practical test is the gap between the highest and lowest layer.

Score each layer separately, identify the lowest, and treat the spread between them as the real risk rather than reporting the best-performing layer to investors or buyers.

For brands planning a campaign

A water technology company preparing for utility-scale deployment can commission this report card before committing, then ask Curran to build or pressure-test a supplier readiness assessment that exposes the weakest layer instead of relying on a single headline number.

Examples: Source 1 · Source 2

Approval is not readiness

Curran focuses on the gap between a customer accepting a technology and the technology proving dependable.

Read more

In their licensing example, a sophisticated multinational inspected and approved multiple installations, then dropped the product line years later.

  • They attribute the failure to the low operational durability score, not the buyer's competence, writing that approval only proves the gaps were not visible in the tests the buyer knew to run.
  • A related post makes the same point from the buyer's side: an established technology has decades of history showing how often things break and what repairs cost, making the choice a rational decision rather than resistance to innovation.
  • They cite PFAS incineration as an example: expensive but known, while cheaper alternatives are still earning their track record.

For brands planning a campaign

For a first utility-scale deployment, the framework calls for auditing what the buyer's acceptance test actually covers and requiring a reference installation, not just a pilot and a deck. A brand can use Curran to define the standard an incumbent already meets, making the comparison about confidence earned, not paper performance.

Examples: Source 1 · Source 2

Pilot site and partner selection

Curran sets out six rules learned from a first pilot in the Omani desert, hundreds of miles from parts and support, reached by a 36-hour door-to-door trip.

Read more

The rules: do not pilot with someone who needs it to work, because desperation leaves no tolerance for a learning curve; avoid showcase pilots that generate press but have no path to procurement; remember that operators, not approving executives, decide whether a system survives; pick sites with a stable process and feed, recalling a desalination pilot where salinity doubled overnight into an untreatable range; keep first sites close to the team, under about three hours; and choose a partner rather than a customer. Curran's proxy question is how close the site is to a kit of JB Weld—that is, how easily parts can be sourced and problems fixed.

Before committing, Curran asks whether the site will tolerate trial and error, whether operators and engineers are engaged, and whether there is a real path to commercial deployment. They advise walking away if any answer is no, even for a very large customer.

Curran notes that one site outside the travel radius stayed in consideration because it had strong partner support, making the distance rule a default, not an absolute.

For brands planning a campaign

A company planning a first deployment can apply the six rules as a site-selection checklist and ask Curran to review candidate sites, including the procurement path and operator engagement, before committing engineering resources.

Examples: Source 1

Acid recovery and supply-chain framing

A commercial post ties spent-acid handling to supply disruption: Curran writes that sulfuric acid prices have tripled since the Strait of Hormuz closure and that China, Turkey, and Russia halted or followed with export restrictions.

Read more

The post describes Regent Water systems for acid recovery, neutralization, and zero liquid discharge aimed at lead-acid, lithium-ion, and zinc battery operations.

  • It claims 85 to 95 percent spent acid recovery, elimination of disposal hauling, and independence from virgin acid supply for sulfuric and hydrochloric acid.
  • It also offers equipment rental for operations not ready for full capital spending and a processing partner network for facilities where on-site recovery does not fit.

The pitch leads with supply chain risk and cost rather than environmental compliance, positioning recovery as a supply decision and offering rental and off-site processing as lower-commitment entry points.

For brands planning a campaign

Battery manufacturers, recyclers, and vendors selling adjacent water or chemical handling services can evaluate Curran for content or advisory work on circular acid recovery, and use the supply-disruption framing to build a business case.

Examples: Source 1

Format: worked examples, self-scoring, and concrete proxies

Curran teaches through first-person case narratives rather than abstract advice.

Read more

Posts return to specific anchors: the Omani desert pilot, the JB Weld proximity test, the 36-hour journey, salinity doubling overnight, a signed multinational license, and a report card scored layer by layer.

  • Numbered rules, colored bullet markers, and closing questions to the reader recur, and the capacitive deionization story is retold from different angles across separate posts.
  • The acid recovery post breaks the pattern with a direct product promotion and hashtags.

For brands planning a campaign

A brand commissioning explainer content, workshops, or due-diligence reviews should expect operational specifics and worked failure cases, not general thought leadership, and supply real project detail to give the material something concrete to work with.

Examples: Source 1 · Source 2 · Source 3 · Source 4 · Source 5

Sources for this section

Brands and businesses

Patrick Curran's posts describe a commercial relationship with Regent Water, which sells acid recovery, neutralization, and zero-liquid-discharge systems to battery manufacturers and recyclers.

Read more

One post speaks on the company's behalf — "we recover 85–95% of spent acid" — and pitches equipment rental and a third-party processing option.

  • The posts do not identify Curran's formal role; ask whether they own the business, work there, or have another connection.
  • No sponsor, affiliate, or investment relationships appear in their posts.
  • ExxonMobil, Amazon, and Intel appear as hypothetical examples in one post; an unnamed multinational licensee appears in another without identification.
  • None is presented as a relationship.

Regent Water

Disclosed partnership

Curran posts on behalf of Regent Water, promoting the company's acid recovery, neutralization, and zero-liquid-discharge systems for lead-acid, lithium-ion, and zinc battery operations.

Read more

The post claims 85–95% recovery of spent acid for reuse, offers equipment rental for sites not ready for capital spending, and points to a processing partner network for facilities where on-site recovery does not fit. It is written in the first-person plural but does not identify Curran's role; ask whether they own the company, work there, or have another connection.

Original disclosure

"Regent Water designs acid recovery, neutralization, and ZLD systems specifically for lead-acid, lithium-ion, and zinc battery operations. We recover 85-95% of spent acid for reuse, eliminate disposal hauling, and give your operation supply chain independence at the worst possible time to be dependent on virgin acid supply."

View example

Sources for this section

Topics and similar creators

Patrick Curran writes about why industrial water and process technologies fail on the way to market, and what to check before a first deployment.

Read more

Start with the five-layer readiness framework, then read the pilot-selection rules as its practical companion: one shows how to score a technology honestly, the other where to test it.

  • The incumbent-advantage piece explains why a buyer's existing supplier usually deserves its position; the acid-recovery post shows how the same logic sounds as a commercial pitch.
  • Read the capacitive deionization story twice — once for the framework, and again to see what it cost when the weakest layer was missed.
  • For adjacent perspectives, the writers below cover factory-floor improvement and AI on production lines, plant leadership and turnaround decisions, and industrial water and wastewater projects in the field.
Technology readiness levels Technology commercialization Industrial water treatment Wastewater treatment Pilot site selection Incumbent technology adoption Acid recovery and reuse Zero liquid discharge Deep-tech commercialization Water treatment engineering Technology due diligence LinkedIn posts First-person case narrative Worked-example essays Numbered rules Industrial technology founders Water treatment professionals Battery manufacturers and recyclers

Devin Bhushan

Both write from inside industrial operations about why improvement work stalls, teaching through concrete procedures rather than general encouragement.

Read more

Bhushan describes an AI agent that watches a changeover and returns a time-and-motion study classified against the seven wastes. Curran applies the same instinct in a readiness report card, turning a vague judgment into a scored, inspectable method.

Bhushan focuses on the factory floor and using AI to find and remove manual waste in production, alongside a recruiting pitch for a Lean Six Sigma leader.

  • Curran focuses on commercializing water and process technology, emphasizing honesty about readiness before deployment.
  • Bhushan sells the tool and the opportunity; Curran writes post-mortems and due-diligence questions.

Read original · Original 2

Cindy Carter

Carter draws lessons from years spent inside more than 40 manufacturing sites across Africa, Central America and East Africa.

Read more

Their writing examines what determines whether a plant performs, matching Curran's habit of arguing from named sites and specific failures rather than theory.

Carter focuses on people, leadership and culture, including a site marked for closure that was saved through a management buy-out.

  • Curran focuses on technical and commercial readiness; in their posts, operators matter mainly because they decide whether a system survives.
  • Carter writes about running and keeping a plant; Curran, about getting a new technology into one.

Read original · Original 2

Anand G

Anand G works in industrial water and wastewater, posting about membrane bio-reactor commissioning for a footwear manufacturer, water reuse and environmental compliance.

Read more

Readers following Curran for water-treatment subject matter will find familiar problems of effluent quality, footprint and reuse.

Anand G's posts cover project and company milestones — a first MBR unit loaded for commissioning and an expatriate housing development under construction — with little analysis of why a technology succeeds or fails.

  • Curran offers frameworks, scored post-mortems and arguments meant to change a decision.
  • Anand G shows water projects happening; Curran examines the conditions under which they hold up.

Read original · Original 2

Sources for this section

Audience

Treat Curran's audience as a professional industrial-water and technology-commercialization readership, not a broad consumer following.

Read more

Their profile lists 24,599 followers as of 9 October 2026—a substantial count for a technical B2B niche, though not a guarantee of campaign delivery.

  • The writing targets people who evaluate, buy, or commercialize process technology.
  • Posts address pilot-site selection, five-layer technology readiness, why an established technology can be the rational choice over a better-on-paper newcomer, and acid recovery for battery operations pitched to plant managers and supply-chain owners.
  • Several close by asking readers what technologies they are assessing and what the full readiness picture looks like, a fit for people with technical, engineering, or procurement responsibility.
  • For a campaign aimed at pressure-testing commercialization readiness before a first utility-scale deployment, the subject matter aligns closely.
  • But the profile provides no audience breakdown by geography, age, gender, industry, employer, or seniority, so fit with a specific buyer persona remains unconfirmed.
  • Ask Curran for audience analytics covering industry, job function, seniority, company size, and geography, or documented audience survey results covering the same attributes.
  • That will show whether readers are the utility and process-side decision-makers the campaign targets or a broader technical following.

LinkedIn followers

24,599

Creator's LinkedIn profile record · 2026-10-09

Sources for this section

Partnership options

Patrick Curran's posts do not describe a creator sponsorship or media-partnership program.

Read more

None of the five posts states a rate card, sponsored-format policy, disclosure practice, audience specification or partnership inquiry route.

  • The only commercial offer is a services offer, not a creator placement: one post describes Regent Water's acid recovery, neutralization and zero-liquid-discharge systems for lead-acid, lithium-ion and zinc battery operations, using "we" in Curran's first-person voice.
  • It says the systems recover 85-95% of spent acid for reuse, eliminate disposal hauling and give battery operations independence from virgin acid supply.
  • It also names two commercial options alongside the core system: equipment rental for operations not ready for full capital expenditure, and an arrangement in which a processing partner network takes spent acid when on-site recovery does not fit.
  • These are buyer-side engineering and service decisions; a brand cannot use this section to build a budget or deliverables list for a paid placement.
  • Ask directly whether Curran accepts sponsorships or paid partnerships, and for terms, before proposing anything.
Sources for this section

Campaign fit

A campaign to shortlist

A water technology company preparing a first utility-scale deployment is a strong fit for Patrick Curran.

Read more

Their posts are built for readers deciding whether a process technology is ready before they commit capital.

  • Their five-layer readiness argument gives the campaign its spine: score the technology, manufacturing process, system around the device, integration into the host plant and long-term operational durability separately, then treat the lowest score as the real answer.
  • Two posts apply that framework to a capacitive deionization program licensed to a multinational, where a company-wide rating of 8 contained a durability layer of 5.
  • The pilot-selection material supplies the second pillar.
  • Six rules drawn from an early deployment in the Omani desert cover failure modes that can hurt a first utility-scale site: a customer desperate enough to have no tolerance for a learning curve; a showcase installation with no route to procurement; approving executives rather than engaged operators; an unstable feed; and a site too far from parts and support.
  • Their proxy for proximity is how close the site is to a kit of JB Weld.
  • The incumbent-advantage post supplies the third: a new technology has to answer the years of operating evidence, parts supply and repair-cost history the established option already holds.
  • A buyer choosing the incumbent is making a rational decision, not resisting innovation.
  • Before booking, agree directly on terms, including any sponsorship program, rate card, disclosure policy or writer's fee; the posts do not specify these.
  • Audience composition is also unverified.
  • Ask for analytics by industry, function, seniority and geography before committing budget.
  • Their own commercial work sells water-treatment systems, so agree explicitly on how vendor-neutral the deliverable will be.

When to choose a specialist

A campaign for a home water-filter brand seeking a short-form video creator to reach a broad lifestyle audience with a product demonstration is a poor fit.

Read more

Curran's posts are long-form text arguments about industrial readiness, pilot logistics and acid recovery, written for people who specify, buy or commercialise process equipment.

  • They offer no video, on-camera work, product demonstration or consumer-facing content.
  • A step-by-step demonstration format, a broad non-technical reach goal and a visual-first deliverable are three separate mismatches with that body of work.
  • The audience question compounds the mismatch.
  • No geography, age, industry, employer or seniority breakdown is documented, so there is no evidence that the following overlaps with consumer home-water buyers; a substantial technical B2B niche audience is a plausible alternative explanation for the same follower count.
  • The one clearly commercial post is a services offer for acid recovery, neutralisation and zero-liquid-discharge systems for lead-acid, lithium-ion and zinc battery operations, with claimed 85–95% spent-acid recovery, equipment rental and an off-site processing partner option.
  • That is a business-to-business sales pitch aimed at plant and supply-chain owners, not evidence of consumer reach or a demonstration format.
  • A sponsored consumer endorsement would also collide with the technical operator audience the content currently serves: a product claim in a promotional voice would be hard to separate from an operating recommendation, especially given Curran's own commercial role in water treatment at an unnamed company.
  • Treat a campaign seeking this consumer-facing format as a no.
  • If a consumer brand still wants to proceed, first ask whether any format is available.
A worked campaign example

Brief: a water technology company wants to pressure-test its commercialisation readiness before a first utility-scale deployment. Campaign angle — "Pressure-test before you commit."

Shape it as a three-part due-diligence series with usable assets, each built on a specific piece of Curran's published thinking.

  • Part one, the five-layer report card: deliver a blank scorecard covering technology, manufacturing, system design, field and plant integration, and operational durability, plus a filled example scoring a line the way they scored the capacitive deionization program — 8 at the technology layer, 5 at durability — and stating plainly that the lowest column governs.
  • The reader produces their own numbers and names the weakest layer out loud.
  • Part two, site and partner selection: turn the six rules into a scoring sheet with a column for each criterion.
  • Will the site tolerate trial and error?
  • Are operators and engineers engaged?
  • Is there a real procurement path?
  • Is the feed stable?
  • How many hours away are parts and support?
  • Is this a partner or a customer?
  • Their claimed 85–95% recovery figures and the Omani 36-hour door-to-door trip both work as reference cases for why a low score should stop a project.
  • Part three, the incumbent counter-sheet: ask the reader to list the evidence the established technology already holds — installed base, parts availability, known failure rates and repair costs, and operators who know how to run it — then rank which gap is cheapest for the newcomer to close first.
  • The PFAS incineration example sets the tone: expensive but known beats cheaper and unproven until field evidence exists.

Make the ask concrete rather than inspirational.

  • End the series with a downloadable readiness pack containing the blank scorecard, pilot scoring sheet and one-page brief template, plus a 60–90 minute paid review where Curran works through the company's actual candidate site and readiness numbers.
  • Success means readers can state their weakest readiness layer and pilot criterion, and identify one piece of incumbent-level evidence they will produce next.
  • Before launch, the client must supply real project detail, since Curran's strength is worked specifics rather than general commentary.
  • Also secure audience analytics and a written agreement on their commercial neutrality in water treatment.
  • Without those, the angle is sound but the fit is unconfirmed.
Sources for this section

Who else to consider

Devin Bhushan

Choose Devin Bhushan when the readiness problem becomes a factory-floor throughput problem.

Read more

The two posts available argue that AI should take over the manual work of process improvement.

  • One describes an agent that watches eighteen minutes of a changeover and returns a full time-and-motion study classified against the seven wastes.
  • The other is a hiring post for a Head of Lean Six Sigma whose job is to judge which process is actually costing money.
  • For a water technology company whose real constraint is line balance, changeover time or hidden manual labour between order intake and finished good, that lands closer to the work than a five-layer readiness scorecard.
  • Bhushan also names the limit plainly: point the camera at the wrong line and you optimise a step that was never the bottleneck.

You give up the water and process-equipment frame.

  • The posts do not cover treatment trains, feed variability, host-plant integration, environmental liability, or how an incumbent technology's installed base and spare-parts history shape a buying decision.
  • They also do not address the proof a utility will ask for: installed references, durability data and operators who know the equipment.
  • The audience is manufacturing operations rather than water utilities or process engineers.
  • The alternative is thin, too: two posts from September 2026.
  • Ask for more work before judging the comparison.

Examples: Source 1 · Source 2

Cindy Carter

Choose Cindy Carter when the obstacle is people and site leadership rather than the technology score.

Read more

One post describes twenty years training teams at more than 40 manufacturing sites on HACCP, ISO systems, GMP, EHS and process improvement.

  • It concludes that the difference between an average and a world-class factory was rarely technology — it was people who wanted respect, to understand why their work mattered, and leaders who listened.
  • A second describes a site earmarked for closure where asking different questions instead of executing the closure led to a management buy-out; the site still operates.
  • That speaks directly to a failure mode Curran identifies: executives approve pilots, operators decide whether they survive.
  • Where the first utility-scale deployment is really blocked by workforce capability, adoption or a site leadership decision, Carter's material is the closer match.

You give up the diagnostic machinery.

  • There is no method for scoring technology, manufacturing or durability readiness, no treatment of manufacturing variation or incumbent evidence, and no capital case a utility buyer would recognise.
  • The content is narrative leadership storytelling rather than a repeatable framework, so a campaign would produce guidance on workforce readiness and change management instead of a due-diligence tool.
  • The evidence is two posts from August 2026.
  • Ask for audience and commercial-availability information before proceeding.

Examples: Source 1 · Source 2

Anand G

Choose Anand G when the campaign needs to show a water treatment system delivered and running rather than analyse whether one is ready.

Read more

The posts announce a first membrane bio-reactor unit being loaded for commissioning at a footwear manufacturer in Ranipet, with claimed effluent quality, small land footprint, reuse potential and compliance.

  • They separately report progress on a housing development in the Oragadam industrial corridor near Chennai.
  • For a supplier seeking visible installation proof in an industrial water market, or a buyer who trusts commissioning milestones over a readiness argument, this is a different kind of evidence from Curran's.

The posts are vendor announcements and project updates, so they read as promotional.

  • There is no critique, scoring method or account of what went wrong — the opposite of a readiness pressure-test, which needs a writer willing to say a technology is a 5 and explain why.
  • Topical focus is also split between industrial water and unrelated residential construction, with two posts from May and June 2026.
  • Ask for the audience, reach and confirmation that this person takes sponsored work.

Examples: Source 1 · Source 2

Sources for this section

Build your campaign brief

Editable Markdown templates for planning a campaign with this creator.

Campaign brief template (blank)

Completed brief: pressure-testing commercialisation readiness before a first utility-scale deployment

Completed brief: acid recovery as a supply-chain decision for a battery operation

Sources for this section

Research methodology

  • Based on five LinkedIn posts by Patrick Curran covering pilot selection, a five-layer readiness framework, incumbent technologies, and acid recovery for battery operations.
  • The acid-recovery performance figures are claims made in a post about Regent Water, not independently verified findings.

Brands they talk about