Will Menkhaus shares practical guidance for public water and wastewater owners on progressive design-build procurement, including how to evaluate proposals, shortlist teams, hold proprietary meetings, and plan contracts.
Will Menkhaus is known for practical guidance on progressive design-build procurement for public water and wastewater projects.
The posts explain how owners can evaluate proposals, choose a shortlist, hold one-on-one meetings with competing teams, and plan contracts.
The examples come from a project involving a new facility built on a small site while an existing treatment plant stayed in operation.
Menkhaus connects procurement choices to what owners can learn about a team and how a project may unfold.
Rather than relying only on similar-looking qualifications, they describe asking each proposer for a design concept, construction sequencing, and explicit tradeoffs for the difficult site.
They also explain the reasoning and limits behind process choices: shortlisting can improve proposal effort, but the right number of teams depends on the project; proprietary meetings can expose unclear goals or flawed assumptions, though they stop short of calling them essential.
Their best-value argument adds the longer-term incentive: a design-builder's reputation can depend on closeout and performance after startup, not just winning the next job.
Readers working through a progressive design-build procurement can follow their work for concrete owner-side questions and examples, alongside reminders to tailor decisions rather than treat one project as a universal template.
Will Menkhaus argues that owners can get better results from progressive design-build by designing procurement around the decisions they need to make—not simply collecting qualifications or the lowest price.
Read more
Their posts connect proposal quality, contractor incentives, fair competition, and early contract planning, while treating each choice as project-specific rather than a universal rule.
Ask proposals to show how teams think
When standard qualifications make firms hard to distinguish, Menkhaus says owners should ask for ideas tied to the project’s hardest problem.
Read more
That makes a proposal evidence of how a team handles risk and tradeoffs, not just a polished account of its experience.
For a treatment-plant project on a small site that had to stay operational, proposers had to present a design concept, detail construction and demolition sequencing, and explain tradeoffs such as shoring costs or reduced plant capacity.
The owner provided plant drawings and a shutdown-scenario spreadsheet.
Menkhaus says the resulting proposals offered distinct approaches for the selection committee to assess.
Menkhaus argues that when future work depends on references and reputation, a design-builder has a business reason to leave the owner satisfied.
Read more
They say reputation does not replace contracts or oversight; both still matter.
Menkhaus points to project closeout and extended water-quality targets before facility acceptance. In their account, the contract sets requirements, but the firm’s interest in strong future references also gives it a reason to finish punch-list work and address startup problems.
Menkhaus sees shortlisting as a way to encourage more serious proposals and reduce review work, while recognizing that excluding teams can mean missing a fresh idea.
Read more
They say the number of finalists should depend on the project, not follow a fixed rule of three.
On the project, an RFQ narrowed the field to three teams. Menkhaus says teams outside the shortlist avoided spending effort on a low-probability pursuit, while finalists could judge the opportunity knowing their odds and the owner could review a smaller set of proposals.
Consider one-on-one meetings—and use them to test the owner’s own process
Menkhaus argues that proprietary meetings can help teams check assumptions and improve proposals.
Read more
They also make the meetings a test of the owner’s instructions: if teams misunderstand the project, the RFP or shared information may need correction. Menkhaus does not call the meetings essential.
Before issuing the RFQ and RFP, the owner asked interested teams through a market sounding and RFI whether to hold proprietary meetings and what they should cover. Menkhaus says every team supported the meetings, helping establish the process before they took place.
Start contract work before procurement gets underway
Menkhaus’s contracting advice reflects the same emphasis on deliberate preparation: a new delivery method needs contract terms suited to the project, and developing them takes time.
Read more
Starting early can prevent rushed decisions and last-minute demands on legal and senior staff.
Menkhaus names performance guarantees, early construction input during design, and reliable cost estimates as provisions owners may want to develop. They also advise tailoring liability limits, off-ramps, and insurance requirements instead of copying a generic template.
This opening argument in the procurement series answers the question a first-time reader is most likely to have: if every shortlisted firm looks qualified on paper, what separates them?
Read more
Read it first; later posts build on its premise that proposals should reveal how a team thinks, not just what it has done before.
Menkhaus observes that standard proposal sections on qualifications, safety records and delivery approach tend to converge, and are often written by marketing teams rather than the people who will run the job.
To break that pattern, the owner treated the request for proposals as an "idea meritocracy."
Because building a new facility on a small site while keeping the existing plant running was the hardest part of the project, every proposer had to submit a design concept, show detailed construction and demolition sequencing to prove it was buildable, and explain the tradeoffs, with examples such as the cost of shoring or property purchases, or reduced capacity in the existing plant.
The owner made that possible by supplying detailed plant drawings and a spreadsheet for modeling different shutdown scenarios.
The result was three detailed proposals with distinct approaches, which the selection committee used to assess each team's mindset.
For brands planning a campaign
Useful material for an owner-facing workshop or talk on writing RFP requirements that force differentiation. The concrete ask—design concept, sequencing and named tradeoffs—is specific enough to adapt directly into a procurement document, and the shutdown-modeling spreadsheet is a tangible example of what an owner must supply.
Readers wondering how many firms to invite, and why the number matters, get a direct answer with both the reasoning and counterargument—not a rule of thumb.
Read more
The owner used a request for qualifications to evaluate every interested team and invited only the top three to submit full proposals.
Menkhaus acknowledges that shortlisting risks excluding a team with fresh ideas, then lays out its benefits: teams that do not make the cut avoid investing in a proposal they were unlikely to win and can move to the next opportunity; those that do make it can size their pursuit sensibly, knowing the odds; and the owner gets more effort from proposers facing a one-in-three chance instead of a wide-open field, along with a lighter internal review load.
They state plainly that three is not always the right number and that it varies by project, framing the decision as a balance between the quantity and quality of proposals.
Skipping shortlisting, they note, implicitly favors quantity.
The post credits best practices from the Design-Build Institute of America and the Water Collaborative Delivery Association, both of which publish free owner resources, and closes with a Kentucky horse-racing comparison: a bet on a three-horse race versus a twenty-horse race.
For brands planning a campaign
A strong segment for an association or utility audience weighing procurement structure: it makes the case while acknowledging that the right number is project-specific, a more persuasive argument than a fixed rule.
This post addresses the strongest objection to a widely recommended practice, making it the best starting point for skeptical readers.
Read more
Proprietary meetings—one-on-one sessions between an owner and each competing team—worry public-sector owners who fear procurement challenges.
Menkhaus argues they lead to better proposals: proposers can test design ideas and check assumptions early, correct course before submitting, and invest more creativity when they know their approach matches the owner's intent.
On the legal concern, they argue that higher-quality proposals make a process more defensible, not less, and that skipping the meetings may feel safer while actually raising risk.
The owner issued a market sounding and request for information before the RFQ and RFP, asking potential proposers whether to include proprietary meetings and what they should cover.
Every team supported holding them, so interested firms also helped set the rules for a sensitive part of the process.
Menkhaus adds that if meetings reveal teams have misread the owner's goals, the fault may lie in an unclear RFP or inaccurate information from the owner; meetings give the owner a chance to fix that before proposals arrive.
They stop short of calling the meetings essential, but say they deserve serious consideration.
For brands planning a campaign
Pair this with the shortlisting post when a client is concerned about procedural risk or challenge exposure. Market sounding is a reusable tactic for owners seeking documented support from proposers before adopting a contested practice.
This post explains the series' underlying mechanism: selection method shapes contractor behavior.
Read more
Newcomers need that idea before the step-by-step decisions make sense.
Because progressive design-build projects are awarded on best value rather than low cost, Menkhaus argues that reputation becomes the asset that wins future work.
Owners hiring a design-builder review its past project experience and call other owners for references; those same owners are later asked to describe the firm's performance, so honest feedback directly affects its chances on later jobs.
They contrast this with hard-bid work, where a firm can cut corners and still win the next contract because its reputation does not always catch up.
Menkhaus illustrates the point with two examples from their own project: contract language requiring efficient completion of punch list items at closeout, where their confidence rests less on the clauses than on the fact that shortchanging closeout would be a bad business decision for the firm; and a requirement that the design-builder hit stringent water quality targets for an extended period before the owner accepts the new facility, where they expect the team to fix startup problems without the owner needing to lean on the contract.
They close by asking whether an owner's selection method rewards great performance.
For brands planning a campaign
A clear framing piece for owners choosing between design-bid-build and collaborative delivery: it ties the delivery method to incentives rather than process preference.
Owners planning their first progressive design-build procurement often underestimate the contract work.
Read more
This post offers a practical scheduling warning and identifies the specific clauses that take time.
For owners new to progressive design-build, Menkhaus says the critical path in procurement runs through contract development.
Issuing the RFQ and RFP and evaluating proposals are familiar tasks; building a contract for a new delivery method is not.
Starting early, they argue, does three things.
First, it creates time to write the method's advantages into the contract, including performance guarantees that hold the design-builder to the owner's goals, provisions that bring construction professionals into design review early and often, and expectations for reliable cost estimates through design.
Second, it lets owners tailor items such as limits of liability, off-ramps and insurance requirements to the project and organization instead of copying a generic template.
Third, it avoids a last-minute scramble that consumes senior leadership and legal calendars, forces rushed decisions and leaves those colleagues less confident in the project's leadership.
Menkhaus reports hearing from owner advisors that delaying contract development is one of the most common and painful mistakes owners make.
For brands planning a campaign
Directly relevant to a scheduling conversation with a utility before procurement opens, and a natural bridge to legal and risk colleagues who might otherwise not engage with the procurement plan.
A numbered, decision-focused series on owner-side procurement5
Best-value procurement as a performance incentive1
Using proposals to find the best ideas1
Proprietary meetings with proposers1
Shortlisting to improve proposal quality1
Contracting early in progressive design-build1
Best-value procurement as a performance incentive
Menkhaus argues that awarding progressive design-build projects on best value rather than low cost changes contractor behavior because reputation and references determine future work.
Read more
They contrast this with hard-bid, where cutting corners may not catch up with a firm.
Project closeout and extended water quality targets illustrate how the contractor's long-term interest, not contract language alone, drives performance.
They still say owners need solid contracts and should not take a laissez-faire approach to oversight.
A numbered Procurement Stage Key Idea post states a principle, contrasts two delivery models, and uses examples from the owner's project to show the reasoning.
The post warns that best-value procurement does not eliminate the need for contracts or oversight: owners should avoid a laissez-faire approach.
For brands planning a campaign
A brand selling procurement advisory, contract tools, or owner-side training can use this framing to position best-value selection as a performance strategy, not just a purchasing preference.
Menkhaus treats the request for proposals as an idea meritocracy when qualifications alone make teams hard to distinguish.
Read more
On an owner's project, teams had to propose a design concept, show detailed construction and demolition sequencing, and explain tradeoffs.
They provided plant drawings and a shutdown-modeling spreadsheet to support the work.
The proposals became a way to assess each team's thinking on risk, resilience, and tradeoffs.
A decision post names a problem, describes a specific change to the RFP, and asks readers what challenges on their own project could differentiate proposers.
For brands planning a campaign
Relevant for brands that help owners write RFPs or evaluate proposals: the post shows a concrete way to shift proposal content from marketing boilerplate toward technical thinking.
Menkhaus makes the case for one-on-one meetings between owners and each proposing team.
Read more
They say the meetings lead to better proposals by letting teams test design ideas and check assumptions early.
They address fears of procurement challenges by arguing that higher-quality proposals make the process more defensible, not less.
Before issuing the RFQ/RFP, the project surveyed interested firms, all of whom supported proprietary meetings.
They also note that the meetings can reveal owner-side issues, such as an unclear RFP.
A post names a challenging best practice, makes the case for it, addresses the main objection, and supports it with a market-sounding step from the owner's project.
Menkhaus stops short of calling proprietary meetings essential, recommending serious consideration rather than a blanket rule.
For brands planning a campaign
Useful for brands working on procurement process design, public-sector risk, or owner education: the post offers language for defending proprietary meetings against challenge concerns.
Menkhaus describes using a request for qualifications to shortlist the top three firms before proposals.
Read more
They list benefits for teams that miss the cut, teams that make it, and the owner.
The core argument is that proposers invest more when the odds are one in three rather than an open field, raising quality and streamlining internal review.
They credit the Design-Build Institute of America and the Water Collaborative Delivery Association for best practices and use a horse-racing analogy about bet sizing.
A decision post explains a choice, breaks out consequences by stakeholder, and closes with a quantity-versus-quality framing.
Menkhaus says a shortlist of three is not always right; the number may vary by project.
For brands planning a campaign
A brand can use this as an example of a concrete procurement lever that changes proposer behavior, relevant to training, playbooks, or advisory content for utility owners.
Menkhaus recommends starting contract development as early as possible in a progressive design-build procurement.
Read more
Early work lets owners build delivery advantages into the contract, such as performance guarantees, early construction involvement, and reliable cost estimates; tailor details like liability limits, off-ramps, and insurance instead of copying a template; and avoid a last-minute scramble that strains legal and leadership calendars. They cite owner advisors who say delaying contract development is a common and painful mistake.
A numbered Contracting Key Decision post lists three reasons, supports each with practical detail, and ends with a direct instruction to start today.
For brands planning a campaign
Good fit for brands offering contract-development support, templates, or owner training on alternative delivery: the post identifies a specific failure mode and its costs.
A numbered, decision-focused series on owner-side procurement
Each post follows a consistent format: a numbered Procurement Stage Key Decision or Contracting Key Decision heading, a practical owner-side recommendation, reasoning from their own project, and a closing question or instruction.
Read more
Recurring themes include contrasting progressive design-build with traditional delivery, crediting industry bodies such as DBIA and the Water Collaborative Delivery Association, and addressing common fears directly. The series moves from procurement choices to contracting.
Each post stands alone while signaling a sequence, letting readers follow one decision at a time.
For brands planning a campaign
A brand can assess this as a repeatable content format for sponsored series, co-branded owner guides, or webinars built around single decisions.
Will Menkhaus's posts name no sponsor, client, employer, owned business, or investment.
Read more
The only organizations named are two industry associations Menkhaus recommends as free sources of progressive design-build best practices — the Design-Build Institute of America and the Water Collaborative Delivery Association. Both are references to published guidance, and the posts do not state a commercial relationship.
Design-Build Institute of America
Mention
In a post about shortlisting proposal teams, Menkhaus credits the Design-Build Institute of America with establishing best practices used on the project and points owners to the association’s free resources for progressive design-build procurement.
Menkhaus mentions the Water Collaborative Delivery Association alongside the Design-Build Institute of America as a source of best practices for water and wastewater owners using collaborative delivery, and recommends its free resources.
Will Menkhaus writes a numbered series of decisions for owners running progressive design-build procurements on water and wastewater projects.
Read more
Readers can start with the procurement-stage posts, which move from putting the best ideas into proposals to shortlisting and one-on-one meetings with proposers, then continue to the contracting-stage post on starting contract work early.
Each post tackles a single decision, explains the reasoning with a concrete example from their own project, and closes with a question or instruction readers can apply.
Read in sequence, the posts make one consistent argument: procurement design, not price or qualifications alone, shapes the proposals an owner receives and the performance they get.
The posts credit the Design-Build Institute of America and the Water Collaborative Delivery Association for the practices they describe, giving readers a place to look next.
Progressive design-buildBest-value procurementPublic-sector procurementWater and wastewater infrastructureContract developmentProcurement strategyOwner-side project adviceNumbered decision seriesFirsthand project examplesWater and wastewater utility ownersDesign-build proposers
Andrew S.
Writes about public-sector procurement documents and argues that how an RFP is written determines what the market offers in response.
Read more
Menkhaus and Andrew S. both see the procurement document—not the vendor pool—as the lever that shapes outcomes. They describe how legacy assumptions in an RFP can filter out better proposals before competition begins.
Andrew S. approaches parking and mobility management, challenging municipal agencies' outdated assumptions in RFPs across a program area.
Menkhaus writes from inside a single owner-side water project, tracing progressive design-build decisions stage by stage and citing named industry best practices.
For marketers choosing between them, Andrew S. offers a broad critique of procurement language, while Menkhaus provides a step-by-step account of rebuilding one process.
Works on wastewater and sewer infrastructure, making the case that familiar processes and unchanged specifications keep better technical approaches out of use.
Read more
That aligns with Menkhaus's emphasis on structuring procurement to reward improvement rather than replication. Both use cost and time comparisons from real projects to make their case.
Chad Smeltzer focuses on technology adoption and asset management, with examples such as manhole inspection methods and proprietary diagnostics.
They write in part for engineering firms looking to sell that value before procurement starts.
Menkhaus stays on the owner's side of the table, focused on how a public agency awards and contracts the work rather than which tools a firm brings.
Writes about proposals and partnerships in a practical, numbered style, arguing that how a proposal is delivered and discussed shapes whether a working relationship forms.
Read more
Menkhaus and Nate Stoltenow both use short first-person accounts, bulleted reasoning, and a closing instruction. Both argue that the process around the document matters more than the document alone.
Nate Stoltenow addresses sales teams, agencies, and B2B service businesses on closing deals and revenue operations in a commercial setting. Menkhaus addresses public water utility owners on procurement and contracting rules, where defensibility and process design matter more than closing speed.
The placement decision is whether a small, sharply targeted water-sector audience can reach water-sector professionals.
Read more
Menkhaus writes owner-side guidance on progressive design-build procurement for water and wastewater projects, drawing on the owner's perspective.
Five posts published between 17 June and 7 July 2025 cover shortlisting, best-value evaluation, proprietary meetings, and early contract development.
The only measured audience figure available is a LinkedIn follower count of 502, observed 9 October 2026.
The posts appeal to public water and wastewater owners, owner advisors, and design-build teams pursuing that work, but actual audience composition is unverified.
Before committing budget, ask for recent results on comparable posts, including impressions and engagement per post and any available follower breakdown by job function, seniority, or location, or documented audience survey results if platform data cannot answer it.
Without that, price the engagement as a niche credibility play rather than a reach play.
LinkedIn followers
502
LinkedIn profile @williammenkhaus; profile-level count at time of observation, not tied to any individual post · 2026-10-09
Will Menkhaus's public posts offer practitioner guidance for public water and wastewater owners running progressive design-build procurements, covering best-value selection, shortlisting, proprietary meetings, and contract development.
Read more
They contain no sponsorship offer, media kit, rate card, or disclosed brand partnership, and describe no paid placements, sponsored posts, affiliate arrangements, consulting engagements, or speaking bookings.
No official inquiry route for a commercial partnership is stated; partnerships may be handled privately or through an employer.
Buyers interested in exploring one should ask directly whether a partnership is available, what format and cost would apply, and how to request it.
Book it as an owner-side advisory or workshop engagement, not a reach play. The subject match is close to exact: Menkhaus speaks from the owner’s side of the table about the same decisions this utility is about to make.
Read more
Brief
A water utility is preparing to procure a new treatment facility using progressive design-build. It needs help structuring best-value procurement, shortlisting, and proprietary meetings, and is considering a talk or advisory engagement on procurement best practices.
Reasons
The brief’s three named topics each have a dedicated post. Shortlisting is covered in a post on using an RFQ to invite three firms; proprietary meetings have their own post, including how to address concerns about procurement challenges; and best-value selection is covered in a post on why best value incentivizes the long game. A fourth post explains how to write an RFP that differentiates proposals, and a fifth covers the contracting stage that follows. Together, the posts track the sequence the utility will work through.
The perspective is owner-side, not vendor-side. Menkhaus describes decisions made on an owner’s project, a selection committee, the owner’s contract language, and a market sounding and request for information run before the RFQ and RFP. That is the vantage point a utility needs when structuring its own process.
The material offers reusable artifacts, not just principles. The proposal ask has three parts: a design concept; detailed construction and demolition sequencing to show the concept is buildable; and named tradeoffs such as shoring costs, property purchases, or reduced capacity in the existing plant. Proposers received detailed plant drawings and a spreadsheet for modeling shutdown scenarios. The shortlisting structure is RFQ first, then three invited proposals. The market-sounding step seeks proposer support for proprietary meetings before the RFQ issues. On contracting, Menkhaus names items to tailor to the project (limits of liability, off-ramps, insurance requirements) and items to write in early (performance guarantees, early construction involvement, expectations for reliable cost estimates).
The material addresses objections this utility’s procurement and legal staff are likely to raise. It tackles concerns about procurement challenges directly, arguing that higher-quality proposals make a process more defensible, and frames shortlisting as a quantity-versus-quality decision. It also acknowledges that the advice is situational: three is not always the right shortlist size, and proprietary meetings merit serious consideration but are not essential. Those qualifications make the material easier to defend internally than a fixed rule would be.
The format suits a session. Each post focuses on one decision, with reasoning, a practical detail, and a closing question for the reader. That maps cleanly onto a workshop agenda and gives the utility prompts for discussing its own project.
The sector grounding is checkable. The shortlisting post credits best practices from the Design-Build Institute of America and the Water Collaborative Delivery Association, both of which publish free owner resources. Utility staff can compare the advice with reference bodies they already use.
Conditions
Engagement terms are undocumented. Will Menkhaus’s posts provide no sponsorship format, media kit, rate card, or inquiry route. Ask directly about price and availability.
Distribution is not the reason to buy. The only published audience figure is a LinkedIn follower count of 502, observed 9 October 2026. No impressions, engagement counts, comments, or follower breakdown by employer, role, seniority, or region are published. Buy for relevance and specificity, and price it as a niche credibility engagement; request audience analytics if reach matters.
Speaking and advisory experience is unverified: Will Menkhaus’s posts mention no talk, webinar, workshop, or advisory engagement. Ask for past sessions, recordings, and utility-owner references before committing.
The numbered series is incomplete: at least one item is missing from the reviewed set. Ask whether more owner-side material exists and request the complete reading order.
Will Menkhaus’s posts do not address state or local procurement regulation in a specific jurisdiction. Pair the session with the utility’s own legal review.
When to choose a specialist
Reject as written. The mismatch is the reach objective and commercial mechanics, not the person’s credibility.
Read more
Brief
A facility-products or general B2B software brand wants a paid, high-volume social campaign to raise broad awareness of a new product among facility and procurement professionals. Success is measured by impressions, clicks, and demo signups across multiple channels, using a sponsored-post format.
Reasons
There is no commercial offering to buy. Will Menkhaus’s posts mention no sponsorship format, media kit, rate card, affiliate arrangement, or inquiry route for a paid placement. Ask whether a sponsored campaign is available and how it would be structured.
Audience scale cannot be planned. The only measured figure is 502 LinkedIn followers, observed 9 October 2026. The posts report no impressions, engagement counts, comments, or follower composition by job function, seniority, or location. Ask for audience data before pricing a campaign on reach.
The subject matter is narrow. All five posts offer owner-side guidance on progressive design-build procurement and contracting for public water and wastewater projects. Menkhaus’s posts do not cover product comparisons, purchasing decisions, or a broad facilities audience, and offer no evidence of a consumer or general-industry readership.
The format is a mismatch. The posts are long-form teaching pieces, each focused on one decision and written for owners managing their own process. They include no call to action, product link, offer, or video, and there is no evidence of a presence on other channels.
Output is low and tightly themed. Five posts make up effectively one series, too little to support a high-frequency sponsored schedule.
Where it could turn
If the same brand sells owner-side advisory, RFP tooling, or contract-development support to water utilities and can accept a small, targeted audience, this brief approaches the good-fit case. The rejection is about the reach and sponsorship objective, not the content’s relevance to utilities.
A worked campaign example
Brief
The water utility brief: procurement and legal staff need to run a best-value progressive design-build procurement for a new treatment facility.
Deliverables to ask for
A 90-minute session delivered to the project team.
A one-page RFP ask list adapted to this facility, covering the proposal content the utility will require from each team.
A shortlist decision memo the utility can take to its selection committee.
A short protocol for proprietary meetings, including what the utility should cover and how it will document the process.
A contract-development checklist with dates tied to the procurement schedule.
Two advisory hours after the session to review draft RFP language.
Next steps
Open with a scoping call covering the utility's procurement rules, project constraints, and timeline.
Confirm availability, fee, and deliverable format.
Ask for two references from utility owners who have worked through a progressive design-build procurement.
Agree on the follow-up advisory hours and a date for the post-session review.
Pair the session with the utility's own legal review of state and local procurement regulations.
Pre read
Send the five posts before the session in a proposed sequence: the RFP post, the shortlisting post, the best-value post, the proprietary meetings post, and then the contracting post. State clearly that the order is proposed.
Proposed format
A 90-minute working session for the utility's procurement, engineering, and legal staff, preceded by a short pre-read and followed by a one-page decision checklist. Offer a virtual or in-person talk plus two advisory hours for follow-up.
Runsheet
0-10 min: Why the selection method changes contractor behavior. Best-value versus hard-bid; reputation and references as assets for winning future work; and closeout and water-quality examples showing how long-term interest can do work that contract language alone cannot.
10-30 min: Writing the RFP so proposals differentiate. The three-part ask (design concept, detailed construction and demolition sequencing, named tradeoffs), supporting material the owner must supply, such as plant drawings and a shutdown-modeling spreadsheet, and what the owner commits to by asking for that depth.
30-50 min: Shortlisting. RFQ first, then three invited proposals. Work through the argument that proposers invest more when competing one in three than in an open field, then have the room decide how many firms its market can support, using the post's concession that three is not always right.
50-70 min: Proprietary meetings. What the meetings cover, how to address concerns about procurement challenges, and the market-sounding and request-for-information step used to get proposer support for the practice before the RFQ issues. Include the second benefit: meetings can expose an unclear RFP or inaccurate owner information before proposals arrive.
70-85 min: Contract development. Why the contract is the critical path for a first progressive design-build project; what to write in early (performance guarantees, early construction involvement, cost-estimate expectations); what to tailor rather than template (limits of liability, off-ramps, insurance requirements); and the scheduling risk of a last-minute scramble across legal and leadership calendars.
85-90 min: Questions for the room, using the closing questions from the posts, such as which project challenges the utility can use to differentiate proposers.
Verify before contracting
Ask whether paid engagements are offered, along with the fee and availability. No rate card, media kit, or inquiry route appears in the posts.
Ask for recordings of past talks, webinars, or workshops; none are mentioned in the posts.
Ask for recent post performance, including impressions and engagement per post, and any follower breakdown by job function, seniority, or location.
Ask whether additional items in the numbered series exist; at least one numbered item is missing from the reviewed set.
Choose Andrew S. if the utility needs to challenge outdated assumptions in its RFP and shift from prescribed tasks to measurable outcomes.
Read more
In posts about municipal parking procurement, Andrew argues that legacy RFP language can rule out modernization before proposals arrive.
They recommend asking vendors to improve results rather than simply perform a task list.
That perspective could help the utility assess whether its facility procurement invites better solutions or reproduces its existing approach.
The examples concern parking management, not water treatment or progressive design-build. The posts do not cover shortlisting, best-value evaluation, or proprietary meetings, so they offer limited guidance for the utility’s procurement decisions.
Choose Chad Smeltzer if the utility’s priority is making the case for technology-led infrastructure inspection and better asset information.
Read more
One post compares manual manhole inspection with optical scanning, gives a cost example, and explains how a reusable digital record can support later review and maintenance decisions. That can help frame the value of innovation in infrastructure work.
The examples focus on sewer inspection and engineering business models, not procuring a treatment facility through progressive design-build.
The posts offer little guidance on owner-side proposal evaluation, shortlisting, or proprietary meetings.
Ask for examples addressing those procurement steps.
This profile draws on five LinkedIn posts about procurement and contracting decisions for a water and wastewater project: a new treatment facility on a small site while the existing plant remained in operation.
The posts cover a partial numbered series; their text does not show publication dates.
The guidance reflects the decisions and examples described in those posts.