Search creators⌘K
  1. Home
  2. Creators
  3. Rafik Galyanurov

Rafik Galyanurov

Rafik Galyanurov shares work on commercial HVAC upgrades, including hospital air-handling and fan retrofits, cooling-tower systems, and building controls. His posts focus on improving reliability and airflow while extending the life of existing equipment.

22.5K followersBased on 10 posts · latest Oct 2026
LinkedIn

At a glance

Rafik Galyanurov is most useful for commercial HVAC retrofit case studies on healthcare airflow, controls, and service continuity.

Best for

A commercial HVAC equipment manufacturer running thought leadership on healthcare retrofit and custom air handling.

Not for

Consumer smart-home or residential HVAC brands, or broad ESG campaigns needing audited carbon outcomes and consumer reach.

Key takeaways

  • A hospital rooftop retrofit upgraded coils, blowers, dampers, and filters with temporary air service.
  • A 7,000 CFM hospital blower went from Friday emergency call to Monday afternoon commissioning.
  • Cooling-tower fans were designed for replacement by two technicians in about two hours.

Check first: Confirm post-level reach, engagement, and audience job title, employer, and geography data.

Main ideas
Retrofit aging air-handling and rooftop units before replacing them · Direct-drive EC motors are a maintenance decision, not just an efficiency upgrade · Critical facilities are judged on uptime and service continuity
Audience
22,503 LinkedIn followers
Read first
Retrofitting two hospital rooftop units instead of replacing them
Ways to work together
Named credit on a completed retrofit · Joint technology-integration announcement · Application content around a specific facility problem
Sources for this section

What they are known for

Rafik Galyanurov shares commercial HVAC engineering work, especially hospital air-handling and fan retrofits, cooling-tower upgrades, and building controls.

  • His LinkedIn posts show how aging equipment can sometimes be upgraded rather than replaced outright, with attention to airflow, reliability, maintenance, and keeping critical spaces operating during the work.
  • The supplied material establishes these project themes but does not identify a signature book, show, or earlier body of work; that identity context remains unverified.

The posts make technical upgrade decisions concrete.

  • They connect a facility problem to the equipment choice and operating consequences: for example, a hospital rooftop-unit retrofit describes upgraded coils, blowers, dampers, and filters, along with temporary air service and a three-day installation for each unit.
  • Other examples give readers practical comparison points, such as a 7,000 CFM hospital blower system commissioned by Monday afternoon after a Friday emergency call, or cooling-tower fans designed for replacement by two technicians in about two hours.
  • The range also includes custom temperature-control equipment and controller integration with smart motors, so the work is not limited to one retrofit type.
  • One shorter university cooling-tower post offers little technical detail, a reminder that not every update provides the same depth.
  • Readers interested in commercial HVAC projects can follow these posts for specific examples of retrofit scope, service continuity, and controls integration.
Sources for this section

Ideas and priorities

Rafik Galyanurov's recurring argument is that aging HVAC equipment can often be modernized rather than replaced, and that the modernization should remove maintenance-heavy parts, keep critical spaces running, and connect cleanly to the building controls already in place.

Read more

The posts return to healthcare uptime, direct-drive EC motors, cooling-tower fan serviceability, and one controller platform that works across motor and blower brands. The work is presented through specific project numbers—airflow ratings, replacement times, component lists—and named installation partners.

Retrofit aging air-handling and rooftop units before replacing them

Rafik Galyanurov argues that full replacement carries costs a retrofit can avoid: major capital expense, long equipment lead times, engineering and design fees, permits, crane work, structural coordination, shutdowns, and extensive installation.

Read more

A retrofit can upgrade only the sections that need work—coils, blowers, controls, dampers, filtration, humidification—and extend the equipment's useful life. The reasoning is operational and financial: keep the existing infrastructure, raise capacity and efficiency, and avoid a larger construction project.

At a New Jersey hospital, two rooftop units were retrofitted in three days each.

  • The work added higher-capacity heating and chilled-water coils, supplemental DX cooling for off-season and humidity control, high-efficiency direct-drive EC blowers, humidifier manifolds, new dampers, and filter racks.
  • Temporary air kept the affected hospital spaces conditioned during each retrofit.
  • The post credits Heatex Technologies for the coils.

The cost logic can cut the other way. In one project, adding variable-frequency drives to old belt-driven exhaust fans was expensive enough that replacing the fans was judged the better long-term choice.

Read original · Original 2 · Original 3

Direct-drive EC motors are a maintenance decision, not just an efficiency upgrade

Rafik Galyanurov repeatedly argues that belts, pulleys, gearboxes, couplings, and grease bearings create the maintenance and emergency-repair burden in HVAC drive systems.

Read more

Direct-drive EC motors remove those components, which they link to lower vibration and noise, better partial-load energy use, precise airflow control, building-management-system integration, and fewer unexpected failures. In hospital critical areas, reliable airflow is framed as a patient-safety and environmental-condition requirement, not only an efficiency goal.

A 5,000 CFM belt-driven fan in a New York hospital was upgraded to direct-drive EC blowers. The post lists no belts or pulleys to adjust, lower energy consumption especially at partial load, less vibration and noise, variable-speed airflow control, remote monitoring and speed control through the building management system, and fewer mechanical parts to fail.

Read original · Original 2 · Original 3 · Original 4 · Original 5

Critical facilities are judged on uptime and service continuity

A recurring priority is that hospitals and other critical spaces cannot wait during equipment work.

Read more

The posts measure success in hours and weekends, not just energy savings, and they describe temporary air, redundancy, and emergency commissioning as part of the solution. This is the argument behind several retrofit stories: the facility keeps serving patients while the air-handling equipment is modernized.

One post says an emergency call came on Friday and the new 7,000 CFM blower system was installed, commissioned, and running by Monday at 2:00 PM, with redundancy and direct-drive EC blowers.

  • Another describes restoring reliable operation on an almost 60-year-old air handler serving a critical hospital area with a roughly 24,000 CFM fan system.
  • Installation on those jobs is credited to All Seasons Comfort.

Read original · Original 2 · Original 3

Controls should make integration simpler, not add another layer

Rafik Galyanurov argues for one flexible control platform that works across different smart motor and blower brands.

Read more

The controller should talk directly to intelligent motors, let users control and monitor equipment and collect operating data, and still keep a simple connection to the building automation system. The posts return to single-point integration and open protocols as the practical test.

A cooling tower fan array at a New York City university had vibration problems that damaged fan bases and led to repeated welding and repairs.

  • The replacement integrated the whole array into the existing Siemens building management system through a single BACnet point, so the facility could monitor and control every fan from the BMS without integrating each fan separately.
  • The same approach appears in a post on testing the Creocore controller with Infinitum motors and in an Ivy League cooling-tower upgrade described as BACnet and Modbus ready.
  • A shorter cooling-tower post repeats the energy-efficiency and reliability theme without the integration details.

Read original · Original 2 · Original 3 · Original 4

Serviceability and spare availability belong in the buying decision

The posts make physical serviceability part of the argument: how much a component weighs, how many technicians it takes, how long a replacement takes, and whether spares are stocked.

Read more

This is a practical counter to equipment that is efficient on paper but difficult to maintain during peak cooling season.

A cooling tower upgrade at an Ivy League university describes axial fans weighing about 90 pounds, a fan that two technicians can replace in about two hours, a system designed for 120% capacity, and fans kept in stock for emergency replacements. The post credits Matrix Mechanical for the installation.

Read original · Original 2

Custom-engineered packages for temperature-critical spaces

Not all problems are retrofits.

Read more

Rafik Galyanurov also argues for custom air-handling packages when the requirement is precise temperature control. The heater and its controls should be engineered and supplied as one package rather than separate components.

A 6,000 CFM custom air heater for a critical space includes full airflow control, precise modulating heat control, stable discharge air temperature, integrated automation, factory-engineered controls, and plug-and-play connection to the building control system. The post says the goal is reliable operation and accurate air temperature.

Read original

Sources for this section

Start with their work

Retrofitting two hospital rooftop units instead of replacing them

Answers what an HVAC retrofit actually replaces, line by line.

Read more

A newcomer should start here because one post carries the whole arc: the cost case against full replacement, the components upgraded, the disruption avoided, and a finished result.

The post argues against replacing two rooftop units at a New Jersey hospital and describes what the retrofit did instead: upgraded heating and chilled-water coils with more capacity, supplemental DX cooling coils for off-season and summer humidity control, high-efficiency direct-drive EC blowers, new humidifier distribution manifolds, replacement dampers, and new filter racks.

  • Each unit took three days, and temporary air kept the affected hospital spaces conditioned while the unit was out of service.
  • The post credits Heatex Technologies for supplying coils, and notes the option of modernizing an entire air handler or only the sections that need work.

For brands planning a campaign

A manufacturer can build content around component-level upgrade decisions — coils, blowers, dampers, filtration — instead of a single product, because the post sells the scope as one package tied to extending equipment life.

An emergency fan upgrade on an almost 60-year-old hospital air handler

Answers how an emergency replacement is engineered, not just how fast it happens.

Read more

It shows the constraints — an old air handler, a critical hospital area, a target airflow — that shape the equipment chosen.

The post describes restoring reliable operation on an almost 60-year-old air handler serving a critical hospital area in New York.

  • The replacement system was engineered for roughly 24,000 CFM, built around maintenance-free direct-drive EC blowers with no belts, lower vibration and noise, reduced energy use, and modern controls and monitoring.
  • The point made is that aging air handlers do not always need full replacement; existing equipment can be modernized with new fan technology and controls while keeping the original unit in service.
  • Installation was completed by All Seasons Comfort.

For brands planning a campaign

Useful for an emergency-response or critical-facilities angle: the story is built on uptime and service continuity rather than energy savings alone.

Emergency hospital blower from Friday call to Monday commissioning

Answers the question of how quickly a critical air system can be replaced.

Read more

The post gives an actual timeline rather than a claim about responsiveness.

The post states the emergency call came on a Friday and the new blower system was installed, commissioned, and running by Monday at 2:00 PM.

  • The system was engineered for 7,000 CFM with redundancy and uses 100% maintenance-free direct-drive EC blowers with no belts, lower vibration and noise, and reduced energy consumption.
  • Installation was done by All Seasons Comfort, and the post tags Rosenberg Ventilatoren, a fan manufacturer.

For brands planning a campaign

A concrete service-level story a partner could reuse: the value shown is turnaround time and commissioning, not just the parts shipped.

Replacing a 5,000 CFM belt-driven fan with direct-drive EC blowers

Answers how belt-driven and EC fan systems compare in practice.

Read more

It is the clearest side-by-side in the set for a reader trying to understand why the drive technology matters in a hospital.

The post describes upgrading a 5,000 CFM belt-driven fan serving critical areas of a New York hospital to direct-drive EC blowers.

  • The stated advantages: no belts or pulleys to replace and adjust, lower energy use especially at partial load, less vibration and noise, variable-speed airflow control, building management system integration for remote monitoring and speed control, and fewer mechanical parts to fail.
  • The post frames reliable airflow in hospital critical areas as a patient-safety and environmental-condition requirement, not only an efficiency goal.

For brands planning a campaign

A strong basis for comparison content that walks a facility engineer through maintenance, efficiency, and reliability tradeoffs of one drive technology versus another.

A cooling tower fan array wired into an existing Siemens BMS through one point

Answers how a new fan array talks to a building system that is already installed.

Read more

The single-point integration is the detail that makes the upgrade practical rather than a controls project on its own.

The post covers a cooling tower fan array upgrade at a large New York City university where the existing fans had ongoing vibration problems that damaged fan bases and required repeated welding and repairs.

  • The replacement uses direct-drive axial fans with maintenance-free operation, reduced vibration and noise, and no belts or traditional drive components.
  • The automated controller integrates the whole array into the existing Siemens building management system through a single BACnet point, so the facility can monitor and control every fan from the BMS without integrating each fan separately.

For brands planning a campaign

Good material for a controls-integration message aimed at facilities teams already committed to a specific BMS, where retrofit compatibility is the deciding factor.

An Ivy League cooling tower upgrade built around weight, service time, and spare fans

Answers what a cooling tower fan replacement costs a facility in maintenance labor and downtime.

Read more

The post quantifies weight, service time, and capacity, which is unusual for this kind of announcement.

The post describes replacing traditional cooling tower fan drive systems with direct-drive EC axial fans at an Ivy League university in New York City.

  • Stated specifics: no belts, couplings, or gearboxes; a system designed for 120% capacity; each axial fan weighing about 90 pounds; and a fan that two technicians can replace in roughly two hours.
  • The fans are BACnet and Modbus ready for integration with building management systems, including fan speed, status, alarms, and operating data, and the post says fans are kept in stock for emergency replacements.
  • Installation was by Matrix Mechanical.

For brands planning a campaign

Supports an availability or serviceability angle: the argument moves from energy to emergency stock and the labor needed to swap a fan during peak cooling season.

Three exhaust fans replaced over two weekends after a VFD cost comparison

Answers why a facility chooses full replacement over retrofitting controls.

Read more

The post shows the arithmetic — the cost of adding variable frequency drives to old belt-driven fans versus replacing them.

The post describes replacing three 7,000 CFM exhaust fans serving critical areas of a New York hospital over two weekends.

  • The old fans had no airflow control, and adding variable frequency drives to the belt-driven units was costly enough that replacement was judged the better long-term choice.
  • The new direct-drive EC exhaust fans are described as maintenance-free with no belts or grease bearings, precise airflow control, reduced vibration and noise, better energy efficiency, and greater reliability.
  • The post also lists turnkey services including engineering, design, manufacturing, installation, startup, and commissioning.

For brands planning a campaign

Useful when a buyer is weighing controls retrofit against equipment replacement; it shows how the cost comparison is framed and where a manufacturer's product fits.

Testing a controller platform against third-party smart motors

Answers what the controls side of this work looks like beyond retrofit projects.

Read more

It shows the platform goal — one controller working across different motor and blower brands — which explains the integration claims in the project posts.

The post reports successful integration and testing of the Creocore controller with Infinitum motors.

  • The controller is described as communicating directly with intelligent motors so users can control, monitor, and collect operating data while keeping a simple connection to the building automation system.
  • The stated goal is one flexible control platform that works with multiple smart motor and blower technologies.

For brands planning a campaign

A controls or interoperability story: partnerships with motor and blower makers could be framed around open integration rather than a single-vendor system.

A 6,000 CFM custom heater package with modulating temperature control

Answers what the custom-engineering capability looks like when the problem is temperature stability rather than airflow.

Read more

It shows the work is not limited to retrofits of existing equipment.

The post describes a 6,000 CFM custom air heater for a critical space needing accurate, stable air temperature.

  • Listed capabilities include full airflow control, precise modulating heat control, stable discharge air temperature, integrated automation, a plug-and-play design, engineered factory controls, and easy connection to the building control system.
  • The heater and its controls are supplied as one package for reliable operation in critical applications.

For brands planning a campaign

An entry point for engineered-equipment or custom-packaging content, aimed at buyers whose requirement is precise control rather than replacement of aging equipment.

Sources for this section

Topics and approach

Posts cited for each topic
Project-case-study publishing format8
Direct-drive EC motors and maintenance reduction5
Critical healthcare HVAC retrofits4
Retrofit instead of full replacement3
Cooling-tower fan arrays and BMS integration3
Custom air-handling and precise temperature control1
Controls platform interoperability1

Critical healthcare HVAC retrofits

Rafik Galyanurov's posts repeatedly document retrofits in hospitals and other critical facilities where ventilation must continue during equipment work.

Read more

Examples include a 5,000 CFM belt-driven fan upgraded to direct-drive EC blowers in a New York hospital, an emergency 24,000 CFM fan upgrade on an almost 60-year-old air-handling unit, and a 7,000 CFM emergency blower replacement that went from a Friday call to a running system by Monday afternoon.

  • One post describes replacing three 7,000 CFM exhaust fans over two weekends because adding variable-frequency drives to the old belt-driven fans was too costly.
  • The work is framed around reliability, patient safety, and maintaining required environmental conditions, not only energy savings.

For brands planning a campaign

A commercial HVAC equipment manufacturer can build thought-leadership content around uptime, emergency response, and retrofit paths for critical healthcare spaces. The strongest angle is not generic efficiency but how a facility keeps serving patients while old air-handling equipment is modernized.

Examples: Source 1 · Source 2 · Source 3 · Source 4

Retrofit instead of full replacement

Several posts make an explicit case for modernizing existing air-handling and rooftop units rather than replacing them.

Read more

Rafik Galyanurov describes avoided capital expense, long equipment lead times, engineering and design costs, permits, crane work, structural coordination, shutdowns, and extensive installation work.

  • A New Jersey hospital project retrofitted two rooftop units in three days each, with upgraded heating and chilled-water coils, supplemental DX cooling, high-efficiency direct-drive EC blowers, humidifier manifolds, new dampers, and filter racks.
  • Another post argues that aging AHUs do not always need complete replacement, and a third says a complete fan replacement was smarter than adding VFDs to old belt-driven equipment.

For brands planning a campaign

Equipment and component brands can co-develop content on lifecycle extension, phased upgrades, and total cost of ownership. This topic gives a manufacturer a clear way to discuss coils, dampers, filtration, controls, and blowers as parts of a retrofit package rather than a single-product pitch.

Examples: Source 1 · Source 2 · Source 3

Direct-drive EC motors and maintenance reduction

A recurring argument is that direct-drive EC motors remove belts, pulleys, gearboxes, couplings, and grease bearings from HVAC drive systems.

Read more

Rafik Galyanurov links that change to lower vibration and noise, reduced maintenance, better energy efficiency, precise airflow control, and fewer unexpected failures.

  • Specific examples include a 5,000 CFM hospital retrofit, a 7,000 CFM emergency blower upgrade, and 7,000 CFM exhaust fan replacements.
  • In the cooling-tower posts, the same claim is applied to axial fans, with a fan described as weighing about 90 pounds and replaceable by two technicians in roughly two hours.

For brands planning a campaign

A motor, blower, or fan manufacturer can use these observations to support comparison content on maintenance burden, partial-load efficiency, and serviceability. The material is strongest when it connects product choices to facility labor, downtime, and emergency repair costs.

Examples: Source 1 · Source 2 · Source 3 · Source 4 · Source 5

Cooling-tower fan arrays and BMS integration

Cooling-tower fan work appears in several posts.

Read more

One project at a large New York City university replaced fans with ongoing vibration problems that were damaging fan bases and driving repeated welding and repairs.

  • The replacement used direct-drive axial fans and integrated the entire fan array into an existing Siemens BMS through a single BACnet point.
  • Another post describes an Ivy League university cooling-tower upgrade using direct-drive EC axial fan technology with no belts, couplings, or gearboxes; the system was designed for 120% capacity and described as BACnet and Modbus ready.
  • Fans were also described as stocked for emergency replacements.

One cooling-tower post is a brief recap focused on energy efficiency and does not include the control or capacity details found in the longer cooling-tower posts.

For brands planning a campaign

Controls, motor, and cooling-tower equipment brands can collaborate on content about simplified BMS integration, single-point monitoring, and fan-array reliability. The single BACnet point detail gives a concrete operational benefit that facility managers can evaluate.

Examples: Source 1 · Source 2 · Source 3

Custom air-handling and precise temperature control

One post presents a 6,000 CFM custom air heater designed for a critical space where stable air temperature matters.

Read more

The described package includes full airflow control, precise modulating heat control, stable discharge air temperature, integrated automation, factory-engineered controls, and plug-and-play integration with the building control system. Rafik Galyanurov frames the heater and controls as one complete engineered package rather than separate components.

For brands planning a campaign

A custom HVAC manufacturer can use this as a proof point for engineered packages, temperature-critical environments, and controls integration. It supports content about when a custom air-handling solution is more appropriate than a catalog product.

Examples: Source 1

Controls platform interoperability

One post covers successful integration and testing between the Creocore controller and Infinitum motors.

Read more

Rafik Galyanurov describes the controller as communicating directly with intelligent motors so users can control, monitor, and collect operating data while maintaining simple integration with the building automation system. The stated goal is one flexible control platform that works with multiple leading smart motor and blower technologies.

For brands planning a campaign

A controls or smart-motor brand can explore thought leadership on vendor flexibility, data collection from intelligent equipment, and BMS integration. The post positions the control layer as a bridge between motor technology and building automation.

Examples: Source 1

Project-case-study publishing format

The posts follow a recognizable structure: a project location and problem, a better technical option, a list of upgrade highlights, a short statement of the operational goal, and a contact call.

Read more

Many posts thank installers or component suppliers by name, which makes the project narratives look like partner-visible case studies rather than isolated product claims. The approach combines specific equipment ratings, such as 5,000 CFM, 7,000 CFM, 24,000 CFM, and 6,000 CFM, with plain explanations of why the upgrade matters to facility operations.

The recurring method is problem-framing, equipment-specific scope, benefit list, and partner credit, often ending with a direct contact invitation for retrofit or emergency work.

For brands planning a campaign

A manufacturer can propose a co-authored case-study series in this format, with joint technical details, named installation partners, and a clear operational takeaway. This gives a brand a repeatable content template that fits the creator's existing publishing style.

Examples: Source 1 · Source 2 · Source 3 · Source 4 · Source 5 · Source 6 · Source 7 · Source 8

Sources for this section

Brands and businesses

Rafik Galyanurov's posts credit a working set of partners around commercial HVAC retrofit projects: the control platform Creocore and the contracting business Cyber BMS are described as "our" operation without stating ownership or employment, while named installers (All Seasons Comfort, Matrix Mechanical) and equipment suppliers (Heatex Technologies, Rosenberg, Infinitum) appear as project collaborators.

Read more

Client sites are hospitals and universities but are not named, so no client brand can be listed.

  • All relationships below are documented from the person's own posts; none is described as a paid sponsorship, and where the commercial arrangement is not stated the item says so.
  • Post dates were not supplied with the material, so no observation dates are given.

Cyber BMS

Disclosed partnership

The posts describe retrofit work as done by "we" at Cyber BMS — "At Cyber BMS, we focus on upgrading existing HVAC equipment to improve performance, efficiency, and long-term reliability."

Read more

The exact relationship is unstated: the material does not say whether this person owns, is employed by, or contracts with the business, only that the work is presented as the group's.

View example

Creocore

Disclosed partnership

Creocore is presented as the group's own control platform: "our Creocore controller" and "one flexible control platform" that communicates with smart motors and integrates with building automation systems.

Read more

Ownership and employment are not stated in the material, so the relationship is recorded as unstated.

View example

Infinitum

Disclosed partnership

A post reports successful integration and testing of the Creocore controller with Infinitum motors, framed as expanding platform compatibility with advanced smart motors.

Read more

The post describes a technical integration, not terms, payment, or an ongoing contract.

View example

All Seasons Comfort

Disclosed partnership

Credited as the installer on emergency hospital fan and blower upgrades in New York — "Installation was completed by All Seasons Comfort" and a thank-you "for the installation and for helping us get this critical system back up and running so quickly."

Read more

Commercial terms and duration are not stated.

View example

Matrix Mechanical

Disclosed partnership

Credited for installation work on a cooling-tower direct-drive EC fan upgrade at an Ivy League university in New York: "A big thank you to Matrix Mechanical for the beautiful installation and excellent workmanship!"

Read more

Terms are not stated.

View example

Heatex Technologies

Disclosed partnership

Credited for supplying coils on a two-unit hospital rooftop retrofit in New Jersey: "Special thanks to Heatex Technologies for supporting us with the coils for this project."

Read more

The post shows project support, not a sponsorship or stated contract.

View example

Rosenberg Ventilatoren / Rosenberg USA

Mention

Tagged on a post about an emergency 7,000 CFM hospital blower upgrade built around direct-drive EC blowers.

Read more

The post does not describe Rosenberg's role, so this is recorded as a mention rather than a stated supplier or sponsorship relationship.

View example

Siemens

Mention

The client university's existing Siemens building management system is named as the platform the new cooling-tower fan array was integrated into through a single BACnet point.

Read more

Siemens is the client's incumbent BMS, not a stated partner or sponsor of this person's business.

View example

Sources for this section

Topics and similar creators

Rafik Galyanurov's posts work through HVAC retrofit projects in detail: hospital air handlers and rooftop units rebuilt with direct-drive EC motors, cooling-tower fan arrays tied into an existing building management system, and custom air handling for temperature-critical spaces.

Read more

Start with the hospital and cooling-tower case studies, which carry the most concrete numbers — 5,000, 7,000, and 24,000 CFM systems, a three-day rooftop retrofit, an emergency call on Friday answered by a running blower Monday afternoon, and a full fan array controlled through a single BACnet point.

  • From there, follow the tags for retrofitting over replacement, direct-drive EC motors, and building automation integration.
  • Readers whose interest is broader than equipment should also look at Jessica Siegrist on industrial energy procurement, Cassten Everidge on industrial power systems for data centers, and Chris Turlica on plant reliability and maintenance practice.
HVAC retrofit Direct-drive EC motors Cooling tower fans Building automation integration Hospital HVAC Custom air handling Energy efficiency HVAC engineering Retrofit engineering Project case studies Facility management Healthcare facilities University facilities

Jessica Siegrist

Writes for the people running industrial plants, turning operations and cost problems into short, practical posts.

Read more

Their energy-procurement writing for food and beverage manufacturers uses the same buyer-facing register as Rafik Galyanurov's HVAC retrofit posts, including a named partner case study and an argument that small consistent decisions beat one big move.

Their subject is energy contracts and market timing rather than equipment. There are no airflow ratings, component lists, or retrofit scope decisions, and the reader is buying energy rather than air-handling hardware.

Read original · Original 2

Cassten Everidge

Explains a single industrial equipment project the way Rafik Galyanurov does: the original design, the constraint it created, the factory-packaged alternative, and the space and cost saved.

Read more

Both work in the same project-narrative format with named components and a clear engineering takeaway for the facility team.

Their work is DC power systems and data-center E-houses, not air handling. The setting is data-center and electrical design rather than hospital or campus mechanical rooms, and the posts sometimes double as trade-show invitations.

Read original · Original 2

Chris Turlica

Makes reliability and uptime the core argument for industrial facilities, backed by operational numbers — capacity utilization, downtime costs, technician knowledge loss.

Read more

That uptime-first framing is the same one Rafik Galyanurov applies to critical hospital air systems, where a failed fan is a patient-safety problem.

Their material argues from maintenance software and AI rather than physical mechanical equipment, and it operates at industry-policy level through op-eds in Fast Company and Forbes instead of documenting specific retrofit projects.

Read original · Original 2

Sources for this section

Audience

LinkedIn is the only channel in the reviewed evidence, and follower count is the only measured audience figure available: about 22,500 followers as of 7 October 2026.

Read more

That is a credible size for a niche built-environment audience and is consistent with the equipment-focused subject matter, but it does not show who those followers are.

  • No geography, age, gender, employer, job title or seniority data is present, and no post-level reach or engagement figures are present either.
  • No video performance summary was supplied, so no format-by-format range can be stated.
  • What the posts do show is the audience being addressed with the material: hospital air-handling and emergency fan retrofits, cooling-tower fan-array upgrades, belt-to-direct-drive EC blower replacements, custom air heaters, and BMS/BACnet/Modbus integration.
  • That points to readers in mechanical contracting, hospital and facility engineering, and HVAC equipment and controls supply rather than a general consumer audience.
  • Treat that as a reading of content appeal, not measured audience composition.
  • For this brief — a thought-leadership partnership on healthcare retrofit and custom air-handling — topical alignment is close, which supports a placement decision on subject fit.
  • The buyer still cannot judge whether the follower base matches a target account list or seniority profile.
  • Concrete next step: request recent post-level reach and engagement for healthcare-retrofit and custom air-handling posts, plus any audience survey or page-analytics export covering geography, industry and seniority.

LinkedIn followers

22,503

LinkedIn profile · 2026-10-07

Sources for this section

Partnership options

Rafik Galyanurov's posts document commercial HVAC retrofit projects and name the companies that contributed to them.

Read more

The clearest pattern is a completed-project post built on measured results — airflow in CFM, capacity targets, completion timelines — that credits the coil supplier, the installing contractor, or the motor manufacturer involved.

  • A second pattern is a technology-integration note, such as testing a controls platform against a specific smart-motor line.
  • No published sponsorship menu, rate card, media kit, or partnership inquiry form appears anywhere in the material reviewed, so scope, deliverables, exclusivity, and payment terms are not documented.
  • A manufacturer should treat any arrangement as negotiated directly and confirm current terms before planning.
  • Because the posts center on hospital air handling, cooling towers, and custom heating equipment, a proposal tied to an actual installation or a joint engineering test fits the way collaborations are presented here.

Named credit on a completed retrofit

Buyer requirement

Supply equipment or components that go into a real installation — coils, blowers, motors, controls — and allow the project's results to be shown, including airflow figures, capacity targets, and schedule.

  • Expect to be named and thanked alongside the installing contractor, as Heatex Technologies, Matrix Mechanical, All Seasons Comfort, and Rosenberg were in the posts reviewed.
  • Agree in writing which performance data and partner names may be published before the work starts.

Joint technology-integration announcement

Buyer requirement

Provide motors, blowers, or control hardware for bench or site testing with the Creocore control platform, and settle in advance what test outcomes can be described publicly.

  • The post documenting successful integration and testing with Infinitum motors is the clearest example of this format.
  • It needs engineering access from the buyer and a factual claim both sides can stand behind; it is not a product launch slot.

Application content around a specific facility problem

Buyer requirement

Contribute engineering detail on a defined HVAC problem — critical hospital ventilation, cooling-tower vibration, off-season humidity control, or a custom air heater for a temperature-sensitive space — and accept that the resulting content keeps the retrofit problem at the center rather than the buyer's product line. The buyer's technical input and access to the project team are the main assets here.

Sources for this section

Campaign fit

A campaign to shortlist

Strong fit for a commercial HVAC equipment manufacturer whose brief is a thought-leadership partnership on healthcare retrofit and custom air-handling.

Read more

The reviewed posts are essentially an existing case-study pipeline: a 5,000 CFM belt-driven hospital fan upgraded to direct-drive EC blowers; an emergency 24,000 CFM fan upgrade on an almost 60-year-old air-handling unit; a 7,000 CFM emergency hospital blower that went from a Friday call to Monday afternoon commissioning; three 7,000 CFM exhaust fans replaced over two weekends after a variable-frequency-drive cost comparison; cooling-tower fan arrays integrated into a Siemens BMS through one BACnet point; and a 6,000 CFM custom air heater for a temperature-critical space.

  • The publishing pattern already gives partners named credit alongside contractors and component suppliers, and the subject matter matches the brief's buyer: mechanical contractors, hospital facility engineers, and HVAC equipment and controls teams.
  • The manufacturer must supply equipment or components, provide engineering access, and agree in writing which airflow figures, capacity targets, timelines, and partner names can be public.
  • Fit is strong on subject and format; it is not yet verified on audience composition or campaign performance.
  • Before committing, request post-level reach and engagement for the healthcare retrofits and custom air-handling posts, plus any audience data covering job title, employer, and geography.
  • Treat it as a scoped pilot — one co-developed case study and one technical integration post — not a broad brand-awareness buy.

When to choose a specialist

Poor fit for a consumer-focused smart-home or residential HVAC brand running lifestyle content for homeowners, or for a broad ESG campaign that needs audited carbon-reduction outcomes and consumer-scale reach.

Read more

The reviewed work is institutional and commercial: hospital critical areas, university cooling towers, a New Jersey hospital rooftop retrofit, an Ivy League cooling-tower upgrade, and a custom heater for a critical space.

  • None of the posts address homeowner problems, consumer savings, or measured carbon accounting.
  • The stated benefits are uptime, maintenance reduction, patient safety, reliable airflow, avoiding full replacement cost, and simpler BMS integration.
  • The audience signal points to mechanical contractors and facility engineering roles, not homeowners; about 22,500 LinkedIn followers is a credible niche built-environment figure, not consumer scale.
  • A consumer brand could still use the commercial channel as a contractor-facing route, but the current evidence does not support a homeowner lifestyle or ESG-outcomes campaign.
A worked campaign example

Brief: a mid-size manufacturer of direct-drive EC blowers and cooling-tower fan arrays wants a thought-leadership series for hospital facility directors on reducing emergency downtime while modernizing aging air handlers.

  • Angle: “The Friday-to-Monday playbook: what a hospital air-handling emergency actually requires.”
  • Anchor the series on the 7,000 CFM emergency blower that was installed, commissioned, and running by Monday at 2:00 PM after a Friday call; the 24,000 CFM fan upgrade on an almost 60-year-old air-handling unit; the 5,000 CFM belt-to-EC hospital blower retrofit; and the three 7,000 CFM exhaust fans replaced over two weekends after the VFD cost comparison.
  • Format: a three-post LinkedIn series co-authored with the manufacturer — problem and decision framework, component choices and redundancy, then timeline and commissioning lessons with the installing contractor — followed by a case study that keeps the hospital retrofit at the center and names the equipment supplier.
  • The manufacturer supplies blowers or motors, reviews technical claims, and is credited; the creator supplies project access, field detail, and the publishing channel.
  • Before launch, agree in writing on data publication, partner names, exclusivity, timeline, and compensation.
  • Measure against post-level reach and engagement for the existing healthcare retrofit posts, then track qualified facility and contractor inquiries, saves, comments from facility engineers, and case-study downloads.
  • First step: the manufacturer sends a one-page brief naming the equipment it can supply and the hospital or health-system types it wants to reach; the creator confirms which project details are publishable and provides a recent reach and engagement export.
Sources for this section

Who else to consider

Jessica Siegrist

Choose Jessica Siegrist when the same campaign decision turns on energy procurement and operating cost rather than equipment retrofit.

Read more

That fits a manufacturer selling heat recovery, electrification, or efficiency systems into food and beverage plants, where the buyer is a plant's finance and operations side and the promise is a more predictable energy cost.

  • Her natural format is a procurement argument: build load profiles from site data, blend fixed and flexible contracts, align procurement with efficiency projects, and treat suppliers as partners in resilience rather than lowest-price vendors.
  • If the brief wants that strategic angle and the food-manufacturing buyer, she speaks to it more directly than a retrofit case-study account.

The tradeoff is domain.

  • Her reviewed posts center on natural gas prices, load profiles, and contract structure for food manufacturers, not commercial HVAC air handling.
  • There is no hospital or healthcare retrofit example, no airflow, CFM, coil, blower, or controls detail, and no mechanical-contractor audience.
  • A manufacturer that needs inspectable field-level equipment work and documented healthcare facility access would get strategy and market framing instead of project case studies.

Examples: Source 1 · Source 2

Cassten Everidge

Choose Cassten Everidge when the brief is a technical pre-sales campaign for packaged or factory-built power systems and the target is data center and mission-critical developers.

Read more

His reviewed posts explain a single design decision in engineering terms — moving a DC power system out of a dedicated battery room into an integrated cabinet, cutting space, coordination, and CapEx — and then promote a trade-show booth and meetings. That pattern suits a manufacturer whose sales motion is engineering review and event-led lead generation, where the partner can quantify a design tradeoff and drive booth traffic.

The subject is DC power for data centers, not commercial HVAC.

  • The reviewed posts contain no healthcare or hospital work, no air handling, cooling-tower, or blower content, and no BMS airflow integration.
  • The engineering depth is real but sits in a different product category, so a manufacturer of blowers, coils, or air handlers would inherit the format without the domain and would need to supply the technical substance itself.

Examples: Source 1 · Source 2

Chris Turlica

Choose Chris Turlica when the brief wants executive-level thought leadership with mainstream business-media placement.

Read more

His posts summarize bylined pieces in Fast Company and Forbes and argue from labor and downtime statistics — factories running at 70–80% of capacity, unplanned downtime costs, the case for embedding AI in frontline maintenance workflows. That suits a brand that wants reach beyond the plant floor and association with a named executive voice on industrial reliability, AI adoption in manufacturing, and reshoring.

The tradeoff is distance from the field.

  • The reviewed content argues macro points and points readers to software; it does not show a specific retrofit, a hospital project, or airflow and controls engineering.
  • A manufacturer that needs inspectable healthcare retrofit examples and a facility-engineer audience would trade that specificity, and the working project detail, for broader reach and a policy-level framing.

Examples: Source 1 · Source 2

Sources for this section

Build your campaign brief

Editable Markdown templates for planning a campaign with this creator.

Creator campaign brief: reusable template

Healthcare retrofit thought-leadership pilot

Sources for this section

Research methodology

  • This page is built from ten posts published on Rafik Galyanurov's LinkedIn account.
  • Each one describes a commercial HVAC retrofit or upgrade project: hospital air-handling and exhaust fan replacements, rooftop-unit retrofits, cooling-tower fan arrays, a custom air heater for a temperature-critical space, and testing of a control platform with smart motors.
  • The projects are at hospitals and universities, mostly in New York and New Jersey.
  • The posts were reviewed as full text; the material did not include post dates, so the time span they cover is not established.
  • The account's own posts are the only first-person material reviewed.
  • Named installers, equipment suppliers, and control platforms appear as project collaborators, and client sites are described by type (a New Jersey hospital, New York hospitals, New York City universities) rather than by name.
  • No post states payment, sponsorship, or contract terms, and none states an ownership or employment role, so those relationships are recorded as unstated.
  • Account data lists about 22,500 LinkedIn followers as of 7 October 2026, and no audience demographics or engagement figures were available.
  • Three comparison creators were assessed from six of their posts, dated April to September 2026, to place the work in context for readers weighing similar people.
  • The reviewed material establishes project themes but does not identify a signature book, show, or earlier body of work, and no sponsorship or partnership formats are documented.
  • Those are open gaps, not findings of absence.

Recent engagement

Across their last 9 LinkedIn posts, the median post got 67 reactions and 6 comments. Checked 2026-11-02.

Brands they talk about